
Documented ProcedureBPA
D o c u m e n t e d P r o c e d u r e
MPZ 001
4100-001-06.05
Department TB / Schell
Servo Line
Page 9 24
Rev. Index D Name 01.06.05 Schell
Date 3.05.2011 released 01.06.05 Lorch
MPZ_001_engl.doc
☞ Avoid any unfavourable leverage on the rack during storage (for lever ratios see
paragraph “Transport and handling”).
☞ Protect the rack against dust or other pollution.
☞ Do not damage the teeth or the supporting/contact surfaces.
☞ Avoid any metal-to-metal contacts between the racks during storage. Put a layer of
protective foil or oil paper between them.
Unpackíng
☞ Check the delivery for completeness by means of the accompanying documents.
Wear gloves for unpacking the rack because it is oiled and may
have sharp edges.
☞ Check the rack for damage. Any transport damages should be reported
immediately.
☞ Dispose of packing materials as required by the local disposal regulations.
Preparing the installation
Lifting gear may be required for the installation oft he racks. Make
sure that suitable, sufficiently dimensioned equipment is available.
☞ Adjust your torque wrench and check its function.
☞ Wear gloves while assembling in order to avoid contact corrosion.
☞ Inspect the racks for external damage and soiling.
☞ A damaged or soiled rack must neither be mounted nor operated.
☞ All contact and supporting surfaces of the rack and the machine bed must be
degreased and cleaned carefully.
☞ The threaded holes in the machine bed must not be degreased since otherwise the
friction value would be too high when tightening the screws and the required initial
stressing force of the screw would not be reached. Apply a little bit of oil, if
necessary.
☞ Use screws as supplied (neither oil, nor degrease them).
☞ Use only grade 12.9 screws.
Comentários a estes Manuais