
Documented ProcedureBPA
D o c u m e n t e d P r o c e d u r e
MPZ 001
4100-001-06.05
Department TB / Schell
Servo Line
Page 12 24
Rev. Index D Name 01.06.05 Schell
Date 3.05.2011 released 01.06.05 Lorch
MPZ_001_engl.doc
6. Plug the displacement unit into the pinholes at the joint of the two racks. One
measuring roll is laid into the tooth gap at the joint and the other two in a tooth gap
left and right of the joint. Position the measuring bridge on the rolls so that the feeler
of the dial gauge can feel the medium roll. Now seek the zero point by displacing
sideways.
7. Using a hexagon socket wrench adjust the set-screw of the displacing unit in such a
way that the rack, which is not yet firmly screwed, can be moved to the left or the right
until the dial gauge reaches the zero position again.
Permissible deviations measured with the mounting set:
Q
4 - - - ±0.004 ±0.004 ±0.004 ±0.004 -
5 ±0.007 ±0.008 ±0.008 ±0.008 - - - -
6 ±0.01 ±0.011 ±0.011 ±0.016 ±0.016 ±0.014 ±0.015 ±0.16
7 ±0.014 ±0.015 ±0.023 ±0.023 - - - -
8 ±0.027 ±0.03 ±0.032 ±0.033 - - - -
9 ±0.027 ±0.03 ±0.032 ±0.033 ±0.036 ±0.038 ±0.041 ±0.062
10 ±0.041 ±0.042 ±0.045 ±0.047 ±0.049 - - -
Comentários a estes Manuais