Max Gear MAX 7142 Instruções de Operação Página 8

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 24
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 7
Documented ProcedureBPA
D o c u m e n t e d P r o c e d u r e
MPZ 001
4100-001-06.05
Department TB / Schell
Assembly Plan
Toothed Racks
Servo Line
Page 8 24
Rev. Index D Name 01.06.05 Schell
Date 3.05.2011 released 01.06.05 Lorch
MPZ_001_engl.doc
Transport and handling
Observe all safety regulations applying to transport and handling with lifting gear.
Make sure that the load is handled and set down slowly and carefully.
Especially when transporting and handling long racks ( 2000 mm), avoid any leverage
upon the rack. Favourable lever arm ratios are as shown in the following drawing:
If necessary, have one or more persons lend a hand.
Transportation is possible within a temperature range from –10 to +60°C.
The appropriate kind of packing is chosen dependent on the means of
transportation which may be by air, by land or by sea:
- Airfreight: In boxes
- By truck: In boxes or on transport pallets
- By sea: In boxes or containers.
For handling pallets or boxes suitable handling equipment should be used.
Improper handling of heavy loads may cause serious or even deadly
injuries.
Improper handling or transportation may lead to transport damages.
Heavy shocks are to be avoided.
The packing should be removed only as much as is necessary for further internal
transportation.
ִ
Storage
If the rack is not going to be installed immediately after delivery, the following measures
should be taken:
Protect the rack against corrosion. The storerooms must be dry. Remove the anti-
corrosive agent only immediately before the installation. When storing for a period of
more than one month, renew the anti-corrosive coating.
Vista de página 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Comentários a estes Manuais

Sem comentários